James Webb Space Telescope (JWST)
Country: United States of America
Earth tracking not applicable
Trajectory model
Upcoming Passes · Over Your Location
About This Satellite
The James Webb Space Telescope travels around the Sun near the Sun-Earth L2 region, roughly 1.5 million kilometres from Earth. It follows a halo orbit around that region rather than sitting motionless at a single point.
Mission context
Keeping the Sun, Earth, and Moon on the sunshield side helps the observatory maintain the thermal environment required for infrared observations. L2 is not a low Earth orbit, and an Earth-centred tracking model cannot represent the operational trajectory reliably.
What to notice in this record
This page deliberately does not draw a current ground track or predict local passes from an old launch TLE. Such an element set can describe a short departure phase without describing where Webb is now. Use the NASA mission source for its operational orbit; a NORAD identifier alone does not make an object suitable for SGP4 Earth tracking.
Mission reference: NASA: Webb orbit. Editorial review: .
Two orbital clocks, not an Earth parking orbit
NASA describes a roughly 168-day circuit around the L2 region alongside the observatory's annual journey around the Sun. These periods refer to different motions and reference frames. Its distance from L2 varies by hundreds of thousands of kilometres; the often-quoted 1.5 million kilometres is not a constant Earth-to-telescope range. An actual communication delay requires a dated spacecraft ephemeris. Nor can a halo circuit be interpreted as a Keplerian ellipse attracted by mass at L2: the point is a geometric equilibrium, not a physical object.
Reference: NASA: Webb halo period, dimensions and varying Earth distance.
Why the launch deliberately left energy to add
The flight-dynamics team reports that Ariane 5 targeted a transfer with less energy than the final requirement. Mission constraints and primary thruster orientation prevented removing orbital energy during transfer, so excess launch energy would not have been an ordinary braking correction. Three planned maneuvers, MCC-1a, MCC-1b and MCC-2, supplied the remaining energy. The deliberate bias was part of the design, not evidence of an underperforming launcher. This historical transfer strategy does not describe the size or timing of current stationkeeping burns.
Reference: Petersen, Richon and Stringer: Webb mid-course correction planning and execution, AAS 22-610.
Accuracy and missing information
The introductory record describes the build snapshot. The orbital snapshot explanation and orbit panel share any successfully retrieved TLE; check the displayed epoch. Reentered objects retain historical data only. Mission history is not rewritten by TLE updates. TLE/SGP4 positions are predictions and can change after maneuvers or updated observations. The 14-day stale-data cutoff is a display safeguard, not an accuracy guarantee. Local passes are geometric predictions, not a visibility forecast. No verified operator or mission status means unknown, not active. Do not use this catalog for collision avoidance or operational flight decisions.
Catalog sources: CelesTrak SATCAT: NORAD 50463 · GCAT: S50463 (source update 2026 Sep 4 2345:57). Supplementary metadata: SatNOGS DB, retrieved 2026-09-05T12:57:25.375Z. Page assembled 2026-10-08. GCAT phase codes describe trajectory phases, not mission health.
Learn more: TLE data · Perigee and apogee · Ground tracks · JOT (Jewawud Live Orbital Map)